During the Visit to AfDB-NGFO, Abuja
During the Visit to AfDB-NGFO, Abuja
First Official Engagement
First Official Engagement of His Excellency to the AfDB.
Water Resources
Gov Darius Ishaku Inspecting the 150 Kilometer Pipe Laying he added to the AFDB’S 6.1 Kilometers Coverage
Advocacy Visit to Galadima of Muri
Advocacy Visit to Galadima of Muri
Elevated Water Tanks.
Elevated Water Tanks
Jalingo Primary Water Supply Project
Jalingo Primary Water Supply Project.
Overhead Tanks.
Overhead Tanks.
Fittings for Water Supply
Fittings for Water Supply
Water Distribution Pipes.
Water Distribution Pipes.
Overhauled Power Generator
Overhauled Power Generator
High Lift Pumping station Wukari
High Lift Pumping station Wukari
Water Pumps for Irrigation Farming.
Water Pumps for Irrigation Farming.
Connection of 300mm Cable to Generator.
Connection of 300mm Cable to Generator.
High Lift Pump House
High Lift Pump House
Overhauled Generator and Overhead Tank.
Overhauled Generator and Overhead Tank.
Water Treatment Facility, Gembu.
Water Treatment Facility, Gembu.
Water Pumping Generators
Water Pumping Generators
Water Tank
450m3 Elevated Water Tanks in Wukari
Water Supply
Additional Erection of 1500 Cubic Meter Elevated Reservoir
Water Supply
Foundation Laying at the Additional Erection of the 1500 Cubic Meter Elevated Reservoir Site of the
Water Supply
450m3 Elevated Water Tanks in Wukari Ready to Receive Water from Ibi Water Works
Pipeline Construction.
Pipeline Construction.
Power Generator, Zing Water Supply Station.
Power Generator, Zing Water Supply Station
Overhauled Generators and Overhead
Overhauled Generators and Overhead
Pipeline Construction.
Pipeline Construction.
Front View of Renovated Office Block
Front View of Renovated Office Block
Dedicated Staff.
Dedicated Staff.